Skip to main content

Loch Buidhe – Lairg (132kv new build pylon foundations) Principal Contractor: Wood Group Installing New foundations for 132kv overhead line pylons. Including traditional pad and collum, Pile caps and rock foundations. VIEW PROJECT Saltley Viaduct Cable Bridge Replacement Principal Contractor: Wood Group Installing Pile cap foundations and constructing masonry towers to support a new cable bridge as part of Hs2 diversion works. VIEW PROJECT Coalburn – Douglas North (Cable ducting project) Client – Scottish Power Energy Networks Installing 4.5kms of ducts, 1km in soft dig and 3.5kms on highway, including tar reinstatement works. VIEW PROJECT SPEN Intrusive Framework (Tower foundation intrusive inspections) Client: Scottish Power Energy Networks Carrying out intrusive investigation surveys on 132kv, 275kv and 400kv transmission towers on various routes across the network to record and inspect foundation conditions.
VIEW PROJECT
Water Treatment Works (Trial holes and cable ducting) Principal Contractor: ESD Carrying out trial holes to identify services using a Vac ex at various locations across Scotland as part of Scottish Water’s future plans for upgrading and future proofing their services
VIEW PROJECT
WA Route (Restoration Project) Client – Scottish Power Energy Networks Restoring working stone pads to original pre construction condition and landscaping vast areas.
VIEW PROJECT
SWS Project Principal Contractor - Wood Group Reinstating 180 working stone pad areas on over 50 kilometres of Overhead line routes in Southwest Scotland. Installing 10 kilometres of new access roads and tracks to forestry specifications
VIEW PROJECT
ZA Route (Tower Muffing) Principal Contractor – Morrison Energy Services Repairing and replacing muffs on ZA route from Edinburgh to the Scottish Borders. VIEW PROJECT Little Barford, Cambridge (132kv new build and sealing end) Main Contractor – Wood Group Installing new foundations for 132kv tower and sealing end plinths. VIEW PROJECT South Kyle Windfarm (Installing wind turbine foundations) Principal Contractor: RJ McLeod Installed 50 wind turbine bases, including bolt cages, blinding and pouring over 25,0003m of concrete and creating new access tracks across the project. VIEW PROJECT OUR PROJECTS Click any map pin to view more details

OUR PROJECTS

FSHV have been carrying out a wide range of Civil Engineering and Overhead Line Foundation works cross the whole of the Uk & Ireland since 2019.

Foundation Solutions HV Grounworks Specialists

LAYING THE
FOUNDATIONS

The Foundation Solutions expertise lays the groundwork for project success!

Our unwavering commitment to quality is evident in every project we undertake. With a legacy built on a foundation of trust and expertise, we take pride in delivering projects that not only meet but exceed expectations. As industry leaders, we seamlessly blend tradition with cutting-edge techniques, ensuring our projects set new benchmarks. Discover the pinnacle of project excellence with FSHV